MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out the upgrade of 2 commercial boiler rooms at PineHurst in Cambridge. This is a housing facility with each boiler room feeding 12 no privately owned flats. The existing boilers were heavily corroded which meant that a repair was not an option. It was also more efficient to install new boilers to give the tenants the best efficiency for there homes. Entire completed a full heating refurbishment with new boilers, associated pipework and BMS control panels. A new electrical system was also installed to ensure the current supply could cope with the residents needs.

MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out a commercial boiler room refurbishment for a very busy hotel in Huntingdon. The works consisted of the removal and replacement of 4no commercial boilers, including all associated pipework, pump upgrades, BMS panel upgrade and full system flushing. We also installed new hot water cylinders throughout various locations in the hotel, as well as cleaning & disinfecting of cold water storage tanks. This obviously had to be carried out as quickly and efficiently as possible to limit the disruption the the hotel and its guests.

MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out yet another project for Emmanul College in Cambridge. These works consisted of 3no student accommodation blocks, with gravity fed water services. Installation of a new plantroom with centralised unvented hot water and balanced cold water feed. Electrical works comprised of full BMS upgrade works, pump and motorised valve wiring including thermostats.