Did you know, as an MCS certified Installer, we can help you with you BUS grant application?

MECHANICAL SERVICES

Entire Group Ltd carried out the installation of 3no disability shower rooms at a college in Cambridge. The overall works comprised of us carefully removing the existing floor coverings, installing hot & cold water feeds, supply & fit of treated studs and build frameworks. We then installed white roc, sanitarywear, grab rails and new flooring throughout.

MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out the upgrade of 2 commercial boiler rooms at PineHurst in Cambridge. This is a housing facility with each boiler room feeding 12 no privately owned flats. The existing boilers were heavily corroded which meant that a repair was not an option. It was also more efficient to install new boilers to give the tenants the best efficiency for there homes. Entire completed a full heating refurbishment with new boilers, associated pipework and BMS control panels. A new electrical system was also installed to ensure the current supply could cope with the residents needs.

MECHANICAL SERVICES 4

Entire Group Ltd carried out the refurbishment of 3no shower rooms with student accommodation for a University in Cambridge. This was the first phase of 12no rooms in total. This was phased to work with the client on access and there budgets. The overall works included stripping out the existing, isolating all services and to drain the current heating system. We then installed new cubicles, anti tamper showers complete sanitarywear upgrade, including radiators, tiling and wet room flooring. While on site we also exposed all the old pipework and replaced to ensure longevity of the new shower rooms.

MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out a commercial boiler room refurbishment for a very busy hotel in Huntingdon. The works consisted of the removal and replacement of 4no commercial boilers, including all associated pipework, pump upgrades, BMS panel upgrade and full system flushing. We also installed new hot water cylinders throughout various locations in the hotel, as well as cleaning & disinfecting of cold water storage tanks. This obviously had to be carried out as quickly and efficiently as possible to limit the disruption the the hotel and its guests.

MECHANICAL SERVICES 3

Entire Group Ltd carried out a conversion of a disused bathroom into a functioning shower room, complete with separate cleaner’s cupboard and facilities. The building was occupied during term times – noise levels had to be at a minimum. The working area was small and compact, with no room for error. The overall works included the upgrading of the hot and cold services in order to remove any legionella risk in the future. Full upgrade of all sanitaryware and brasswear and decorating throughout.

MECHANICAL & ELECTRICAL SERVICES

Entire Group Ltd carried out yet another project for Emmanul College in Cambridge. These works consisted of 3no student accommodation blocks, with gravity fed water services. Installation of a new plantroom with centralised unvented hot water and balanced cold water feed. Electrical works comprised of full BMS upgrade works, pump and motorised valve wiring including thermostats.

MECHANICAL SERVICES 2

Entire Group Ltd were appointed by Cambridge Interiors for our 4th M&E Project, to be carried out at Abbexa Life Sciences in Bar Hill Cambridge Mechanically we carried out commercial split of existing services and installation of heating, commercial catering & washroom facilities & lab. The system supplied from the existing water & gas supply network with connections made out of hours and coordinated with the other areas which are fed from the incoming supplies.

MECHANICAL SERVICES

Entire Group Ltd have carried out refurbishment and installation of several laboratories throughout Cambridge. This particular project was a completely new installation of a lab in Cambridge. The mechanical and electrical services within the facility on this project were complex. Existing water and drainage was limited due to the original office space, however it was realised that another lab was more prudent than an office. Therefore, we had to design hot and cold water services; including CAT5 supplies, with fusion welding gravity waste pipes to serve multiple outlets and equipment. The electrical works comprised of additional power and data to be taken from the existing supply. As with all life sciences projects the laboratory was required for urgent research which can now take place within the facility